Additional Assay Results For Borden Lake Gold Project
TORONTO, ON - Probe Mines Limited reported that it has received further assays from its ongoing drilling program at the Company's Borden Lake Gold Project near Chapleau, Ontario. Results for diamond drill holes BL11-115 to BL11-122 were received with intersections of up to 111 metres averaging 1.1 g/t gold ("Au") in the infill drilling. Results are also announced for the first six exploration holes testing targets along-trend of the Borden Lake Zone in the area of the fold hinge. Holes BN11-01 to BN11-06 returned intervals of up to 13 metres averaging 0.5 g/t Au, with individual samples of up to 3.2 g/t Au.
Drilling results confirm the continuity of the mineralized zone within the previously announced Initial Resource Estimate and are also successfully extending the deposit to depth. Hole BL11-121 identified higher grade mineralization down to a vertical depth of approximately 306 metres, including a 50 metre-wide interval averaging 1.9 g/t Au, while hole BL11-119 identified gold mineralization down to a vertical depth of approximately 416 metres, the deepest intersection to date on the Borden Lake Zone. Hole BL11-115 was stopped while entering a higher-grade mineralized zone at approximately 400 metres depth and will have to be lengthened or re-drilled.
The company's address is Suite 306, 2 Toronto Street, Toronto, ON M5C 2B6, 416-777-6703.