Tunnel Extension Reaches Aguilar Vein
LAS VEGAS, NV - Franklin Mining, Inc. reported that 2008 pre-production development at the Escala Mine Joint-Venture resulted in three excellent cross cut haulage tunnels. Of these, the Anita, intersects the historic Aguilar Vein
Trucks are available and will begin transporting more than 1,000 tons of ore mined and removed as tunnels are being extended. Until the Escala's processing plant is fully operational, processing will be done by plants in the area. Previous samplings have shown this material holds 3% Zinc, 2.5% Lead and 300 grams of Silver per ton.
The company's address is 8023 Vantage Drive, Suite 680, San Antonio, TX 78230, (210) 525-1267, fax: (210) 525-1289.