Update On Planned Drill Program At Pucarini High-Sulfidation Gold Project
VANCOUVER - Forte Minerals Corp. report on a planned 1,500-metre diamond drill program at its Pucarini Gold Project located in the Southern Peru Miocene High-Sulfidation Epithermal Gold Belt. The program is set to commence towards the end of Q2 2025 with preparations currently underway.
The upcoming five-hole, 1,500-metre drill program will systematically test high-priority targets identified through geological mapping, geophysical surveys, and geochemical analysis.
The 1,000-hectare Pucarini claim hosts multiple gold-bearing advanced argillic alteration zones within a 3.6 x 1.8 km alteration footprint. Surface geochemistry has returned anomalous gold values coinciding with resistivity, chargeability, and magnetic anomalies, highlighting multiple untested targets for drilling. The main target indicated by the soil and rock gold anomaly spans 1.2 km x 700 m within this advanced argillic alteration zone. The coincidence of gold, molybdenum, and copper surface anomalies is supported by a coherent high chargeability anomaly (> 18 mV/V) from the 3D inversion of the IP geophysical survey data with dimensions of 1.5 km along strike x 600 m wide x 400 m deep; to detection limit depth of the IP geophysical survey, which remains open at depth.
The main target also coincides with a high magnetic susceptibility anomaly in the system's center from the 3D inversion of the surface total magnetic intensity geophysical data, suggesting the roots of a deeper porphyry system. This program will mark the first-ever drill program on the property, unlocking its untapped potential.
CEO Patrick Elliott, said, “We are excited about the potential at Pucarini and are finalizing preparations for our inaugural drill program. Given the strong surface geochemistry, extensive alteration, and compelling geophysical signatures, we believe this project presents a promising opportunity for discovery. While waiting for the rainy season to conclude before mobilizing, our team is actively engaged in planning and ensuring all logistics are in place for a successful program.”