Intersections Of Visible Sulfide Mineralization At The Boston Mine Project

VANCOUVER - Masivo Silver Corp. has intersected visible sulfide mineralization on hole No.2, No.3 and No.4 at the Boston Mine, Masivo's high-grade gold, silver and copper project in "Elko County" in the State of Nevada. Masivo Silver is in the process of drilling Hole No.5 and the core of holes 2, 3 and 4 has been sent to an independent lab for assaying. Drilled Hole Depths: Hole No.2: 456.05 ft; Hole No.3: 328 ft; and Hole No.4: 400 ft.

"Hole No. 2, 3 and 4 showed us visible sulfide mineralization in their core, this is great news, we are very excited to receive our assay results," said, David Coburn, President & CEO.