Further High-Grade Intercepts From Drilling At RPM Starter Pit Area

ANCHORAGE, AK - Nova Minerals Limited reported further high-grade intercepts from the first eight holes of the 21 hole reverse circulation (RC) drilling program conducted in the RPM starter pit area in 2024, within its over 500km2 flagship Estelle Gold Project, located in the Tintina Gold Belt in Alaska. The shallow drilling program was focused on near surface mineralization <50m in depth in support of the RPM starter mine Feasibility Study (FS) currently underway.

Results from shallow infill and step-out drilling confirms continuity of near surface high-grade mineralization at RPM North with multiple broad intersections grading > 5 g/t Au from surface and sample interval grades up to 39 g/t Au. High-grade gold intersections targeting near surface mineralization above the current high-grade Measured and Indicated core continue at RPM North with all holes ending in mineralization.