Near Surface Gold Intersections At The Reefton Project

VANCOUVER - Rua Gold Inc. reported on the drilling campaign underway at the Reefton Project on the South Island of New Zealand. The Company commenced its near mine drill program on the Murray Creek targets in July. A second drill rig was introduced in September to test the Capleston vein system. These historic mines collectively produced ~700koz of gold at 25.2g/t within a radius of ~20 kilometers.

Robert Eckford, CEO, said, "Our five years of meticulous surface exploration work over the Reefton project is paying dividends from the outset of this drill program. Both of the initial drill holes have confirmed we are in right area and are locating these lodes. The near surface intercepts on Capleston are encouraging and makes for compelling economic ounces, it supports our thesis that the surface veins are continuous past the old workings. Despite the initial drill hole at Murray Creek hitting old workings, it is extremely encouraging that we have identified the dip angle of the Victoria lode and we have even more confidence with the subsequent hole that is underway now, and results from this will be ready soon.”