Deep Core Holes Completed At Majuba Hill Nevada Porphyry Project


VANCOUVER - Bam Bam Resources Corp. reported that drilling in core holes MHB-7, MHB-8, and MHB-9 are complete. The core holes were placed to expand the sulfide copper porphyry mineralization intersected in historic drilling and to extend the known oxide mineralization. Three holes were drilled for a total of 4920 feet (1499.6 meters).

David Greenway, President and CEO, said, "I am pleased with the substantial progress at Majuba this year. Our staged exploration approach continues to advance the project and provide encouragement that Majuba will become an important copper, silver, and gold porphyry project. I look forward to receiving the assay results from the deep core drilling."

The Company is also pleased to note that the property-wide geochemical and geophysical programs are proceeding well. Bam Bam was able to utilize its relationship with North American Exploration services to expedite completion of an expanded soils program. The additional samples extended the soil sample grid into new areas. Samples were submitted to ALS and initial results are expected in 4 to 6 weeks. Bam Bam has a detailed drone magnetic survey scheduled for late December 2020/early January 2021. This program will add to the ground magnetic survey data collected in 2018. The recent RC drilling results are highly correlative with the anomalous mag lows interpreted from the 2018 data.

Bam Bam's drilling and exploration program for next year is being finalized. The property-wide work will incorporate and expand the ongoing soil geochemistry and the deep IP geophysical surveys. The programs are planned to guide the District Level exploration at Majuba Hill. Final program layouts will be completed after all drill results have been returned.