Completion Of Phase 1 Resource Expansion Drilling At Cascades Project


VANCOUVER - DFR Gold Inc. announced the completion of the first phase of a 10,000 meter drilling program on the Cascades Project in Burkina Faso, West Africa. The completion of 5,641 meters of reverse circulation drilling represents the latest part of a longer-term program to systematically test exploration targets within the mineralized shear corridor at the Cascades Project. 5,641 meters of Reverse Circulation drilled in 57 drillholes at five target areas. Two significant new zones confirmed with resource potential from first pass drilling at Sina Yar and Far East targets. Intersections at Sina Yar included 34 meters @ 1.83 grammes per tonne (g/t) of gold in CS23-RC077 from 50-84 meters. At the Far East target a wide mineralized zone with 48m@ 0.42g/t. Extension of the 2022 discovery zone from step-out drilling at the TT13 target.

John McGloin, CEO, said,  "These positive drilling results reinforce the potential scale of the gold resource at Cascades through the identification of new zones and further delineation of already identified areas. We are encouraged by the consistent mineralization across the license area and are undertaking further analysis to determine the optimal approach for the second phase of drilling."