DeLamar Project Ongoing Drill Program
VANCOUVER - Integra Resources Corp. reported drill results from an ongoing metallurgical drill program at the DeLamar Project. Metallurgical drilling at Sullivan Gulch, a target east-southeast of the DeLamar Deposit, has been designed to further optimize and potentially include additional mineralized material from Sullivan Gulch in future studies.
“Sullivan Gulch continues to be an exciting target for the Company, typically characterized by long widths of well-distributed mineralization. While a portion of mineralized material from Sullivan Gulch will be included in the upcoming Pre-feasibility Study, this drill program was designed to further understand the metallurgy at Sullivan Gulch and demonstrate the potential to add additional mineralized material from Sullivan Gulch to future studies on the DeLamar Project,” said, George Salamis, President and CEO. “Sullivan Gulch remains open at depth and along strike to the south. The potential inclusion of additional mineralized material from Sullivan Gulch, subject to further optimization work, has the potential to increase future production profiles and mine life. Drill results, along with drill results released in 2018 and 2019 from Sullivan Gulch, continue to showcase consistent runs of more than 100 m grading over 1 g/t AuEq.”