Multiple Gold Intercepts At Omega Gold Project


TORONTO - Mistango River Resources Inc. reported multiple gold intercepts at its Omega Gold Project, including one that yielded 13.83g/t Au over 1 meter in hole OMG22-006. Mistango will follow up on these gold intercepts at the Omega Gold Project in a subsequent drill program. The Company is also expected to resume drilling at its flagship Kirkland Lake West project located adjacent to Agnico Eagle Mines Limited's Macassa Mine in Kirkland Lake, Ontario.

The winter program at Omega yielded results of 13.83g/t Au in hole OMG22-003 at 33 to 34 meters and several 1 to 2-g/t intercepts in holes OMG002-001, OMG22-002, OMG22-003 and OMG22-004.The following are details of the key Diamond Drill Hole intercepts: 1) OMG22-006: 13.83g/t Au from 33 to 34 meters and 2.56g/t Au from 165 to 169 meters, including 3.82g/t Au from 165 to 167 meters. 2) OMG22-001: 2.81g/t Au from 162 to 163 meters. 3) OMG22-003: 0.58g/t Au from 380 to 388 meters and 1g/t Au from 467 to 469 meters, including 1.82g/t Au from 468 to 469 meters and 0.72g/t Au from 574.64 to 578.5 meters, including 1.23t/t Au from 575.64 to 576.64 meters. 4) OMG22-004: 1.24g/t Au from 52 to 52.67 meters and 1g/t Au from 55.2 to 57 meters. 5) OMG22-005: 1g/t Au from 130 to 133.6 meters including 1.79g/t Au from 132 to 133 meters and 0.83g/t Au from 144 to 147 meters, including 1.68g/t Au from 146 to 147 meters and 1g/t Au from 245 to 246 meters.

Mistango is planning to follow up this program at Omega to expand the known high-grade zones and test for additional gold zones. Mistango will seek to drill five 500-meter holes in the Southwest Extension. This area was not part of the winter program due to permitting challenges, which have since been resolved. This round of drilling will test beneath previous high-grade intercepts on Omega.