Silver Intersections At The Silver Sand Project


VANCOUVER - New Pacific Metals Corp. reported on assay results of additional 20 holes from the 2022 drill programs at the Silver Sand Project as part of its 15,000 meters (m) resource infill and step-out drilling for a mineral resource estimate update. An expanded program of total 21,309 m in 94 holes have been completed so far in 2022. The assay results for the remaining 59 drill holes are pending.  Drill hole DSS646001 intersected an interval of 60.48 m grading 236 grams per tonne ("g/t") silver ("Ag") from 82.10 m to 142.58 m, including 6.45 m grading 1,423 g/t Ag from 103.25 m to 109.7 m. This is an infill hole drilled in the southern portion of the deposit which confirmed the continuity of high-grade mineralization in the core area of Silver Sand. An aggregate of 9.6 m of historical mining voids were intersected in this hole. Drill hole DSS644001 intersected an interval of 133.63 m grading 91 g/t Ag from 23.0 m to 156.63 m, including 8.83 m grading 296 g/t Ag from 56.92 m to 65.75 m, and 22.56 m grading 246 g/t Ag from 90.0 m to 112.56 m. This is an infill hole drilled in the southern portion which confirmed the continuity of high-grade mineralization in the core area of Silver Sand. An aggregate of 13.38 m of historical mining voids were intersected in this hole. Drill hole DSS5428 intersected an interval of 20.9 m grading 84 g/t Ag from 39.0 m to 59.9 m and an interval of 32.31 m grading 171 g/t from 82.24 m to 114.55 m, including 5.2 m grading 554 g/t Ag from 93.5 m to 98.7 m, and 4.42 m grading 461 g/t Ag from 104.42 m to 108.84 m. This is an infill hole drilled in the northern portion of the core area of Silver Sand which confirmed the continuity of high-grade mineralization.

Drill hole DSS527506 intersected an interval of 77.59 m grading 102 g/t Ag from 41.39 m to 118.98 m, including 13.56 m grading 285 g/t Ag from 105.42 m to 118.98 m, and an interval of 2.77 m grading 739 g/t Ag from 171.33 m to 174.10 m. This is an infill hole drilled in the northern portion of the core area of Silver Sand. Drill hole DSS527510 intersected an interval of 59.61 m grading 100 g/t Ag from 18.42 m to 78.03 m. This is a step-out hole drilled to confirm the continuity of mineralization between sections in the northern portion of the core area of Silver Sand. Drill hole DSS542503 intersected an interval of 21.08 m grading 74 g/t Ag from 38.92 m to 60.0 m and an interval of 20.41 m grading 292 g/t Ag from 98.15 m to 118.56 m, including 4.36 m grading 685 g/t Ag from 114.2m to 118.56 m. This is a step-out hole drilled to confirm the continuity of mineralization between sections in the northern portion of the core area of Silver Sand.

Drill programs in 2022 started in late January and have progressed well and on schedule. To date, 21,309 m have been completed in 94 holes, expanding the budgeted 15,000 m announced early this year. Most of the drilling completed to date in 2022 is in the core area of Silver Sand, totaling 19,424m in 87 holes, including resource infill drilling to improve the confidence in the continuity of mineralization and step-out drilling to test the extension of the major mineralized zones up and down dip as well as on strike. The results of the infill and step-out drilling will be included in the mineral resource update of Silver Sand expected to be completed in the second half of the year and will be incorporated into the Preliminary Economic Assessment (PEA) due by the end of 2022.

Currently, two rigs are deployed at Silver Sand – first rig is drilling some of the satellite prospects surrounding the Silver Sand Project and the second rig is drilling 10 geotechnical holes required for open pit slope angles for the PEA and further in-fill drill holes targeting upgrading inferred resource blocks for further studies subsequent to the -PEA.