Preparation For Drill Program At The Lithium Butte Property
VANCOUVER - Rockland Resources Ltd. continues to prepare for the first modern drill program targeting lithium and beryllium mineralization on its Lithium Butte Property, located in Juab County, approximately 185 kilometres southwest of Salt Lake City, Utah. The reclamation surety amount has been posted and received by DOGM, in conjunction with the Bureau of Land Management (BLM), related to the Company's Notice of Intent (NOI). In early August, Company personnel met with representatives of National EWP Inc., of Elko Nevada, to inspect the specific drill sites ahead of mobilization of the drill equipment and personnel. An excavation contractor has been retained to prepare drill site locations, clear roads and trails of debris, and is expected on site this week. Drilling will follow, subject to the drill contractor's schedule. The company's site preparation and drill program are specifically designed with compact, low-impact equipment to minimize the environmental footprint. The program proposes 1,220 metres (4,000 ft) of reverse-circulation (RC) drilling, in 14-16 holes, directed at areas of known (from surface sampling) lithium and beryllium mineralization, and also "blind" targets under alluvium and/or volcanic cover. The "Saddle Zone" is the main beryllium (Be") target on the Lithium Butte property, where sampling by the Company has returned continuous chip samples from outcrop over 25.5 metres averaging 1,142 parts per million (ppm) Be (and 352 ppm lithium (Li)), with a higher-grade portion returning 2423 ppm Be over 6.13m (and 371 ppm Li). Materion's beryllium ore grade at the Spor Mountain operations is estimated at 2,500 ppm Be (0.25% Be).
The Lithium Butte property hosts claystone volcanic tuff breccia units interpreted to be prospective for lithium, beryllium and rare earth mineralization. Company sampling has returned up to 4,080 ppm Li from a grab sample and channel sampling returned 25.2 metres at 1,388 ppm Li, including 8.0 metres at 2,155 ppm Li and 0.7 metres at 3,540 ppm Li. Multiple prospective targets have been indicated and Rockland's RC program is designed to test for both lithium and beryllium mineralization.
Mike England, Chief Executive Officer, said, "We are excited to initiate drill pad preparation this week, directed at a maiden drill program when the drill contractor becomes available in late September or early October. Drilling will be directed at multiple mineral targets."