Paca North Discovery Drills 27 Meters of 159 g/t Silver from Near-Surface Oxides Including 1.5 Meters of 565 g/t Silver In Bolivia


VANCOUVER - Silver Elephant Mining Corp. reported on diamond drilling results from the Paca deposit within its 100%-controlled Pulacayo silver project in the Potosi department of Bolivia. A total of 8 holes were drilled at Paca, totaling 1,717 meters. PND 119, 120, 121 & 122 were drilled to test induced polarization ("IP") geophysical anomalies located to the east of the current Paca resource. PND 123, 124, 125 & 126 were drilled to test potential northern extension of the Paca resource.

Notable results include PND 123, collared at the northern edge of the Paca resource and drilled further to the north. The hole intercepted 27 meters of 159 g/t silver from near-surface, including 1.5 meters of 565 g/t silver. PND 123, 124, 125 & 126 are step-out holes and all intercepted silver mineralization demonstrate the northern extension of Paca oxide resource that is open to the north and to the northeast by at least 100 meters. The company plans to conduct further drilling to expand the Paca oxide resource in 2nd half of 2022.

Paca north's shallow oxide expression and flat-tabular morphology may be well suited for a potential open-pit operation, which the company will announce the commissioning of a prefeasibility study shortly and provide an update on its environmental permitting efforts enabling an open-pit mining, leach processing operation at Paca.

John Lee, Chairman, said, "Silver Elephant's 2022 priority is all about Paca: expanding oxide resource, completing environmental permitting and a prefeasibility study. Our goal is to accelerate Paca development to reach a mine construction decision in early 2023."

PND 119, 120, 121 & 122 are exploration holes that tested IP anomalies located east and southeast from the Paca resource. All 4 holes encountered metal-bearing sulphide mineralization and the results confirm Paca hydrothermal mineralizing systems continue eastward beyond what was previously known. The Company is incorporating all available drill data, mapping, sampling, and geophysical data to better understand the geological and resource models to generate new drill targets.

PND119 was the first hole to test a large semi-circular IP anomaly approximately 160 meters southeast of the known Paca resource. The hole was planned to intercept the anomaly and also drill under a historic artisanal mining trench. The anomaly was targeted between 325-350 meters downhole. The hole encountered 2 meters of 31 g/t Ag, 1.14% Pb, 1.15% Zn, 112 g/t AgEq within a larger interval 39 meters of 5 g/t Ag, 0.40% Pb, 0.49%, 37 g/t Ag.

PND120 was designed to test a potential down-dip extension of the 39 meters of mineralization encountered in PND119 and to ascertain any potential increase in concentration of this mineralization. A 36 meter interval was intercepted from 39-75 meters of 12 g/t Ag, 0.21% Pb, 0.08%, 0.51% Zn, 33 g/t AgEq including 7 meters of 14 g/t Ag, 0.21% Pb and 0.94% Zn, 56 g/t AgEq and encountered sulphides from 184-187 meters at 28 g/t Ag, 2.18% Pb, 0.64% Zn, 126 g/t AgEq. Both these intercepts precede the expected down dip portion of PND119. An intercept in the target area at 280-284 meters returned 6 g/t Ag, 0.52% Pb, 0.60% Zn, 46 g/t AgEq.

PND121 was planned to test strong IP anomaly 280 meters south of the Paca resource and cross cut faulted structures indicated from surface mapping. A 2 meter interval of sulphide mineralization was encountered at 57-59 meters grading 1 g/t Ag, 1.25% Pb, 2.64% Zn, 147 g/t AgEq nested within a wider interval of 18 meters (50-68 meters) of 2 g/t Ag, 0.65% Pb, 0.81% Zn, 56 g/t AgEq. Another 4 meter interval shortly downhole of this interval from 75-79 meters grades 56 g/t Ag, 0.16% Pb, 0.12% Zn, 60 g/t AgEq.

PND122 was designed to test an IP anomaly 240 meters southeast of the Paca resource. Disseminated sulphides were encountered from 34-56 meters (22 meters) grading 1 g/t Ag, 0.56% Pb, 0.46% Zn, 38 g/t AgEq, and a silver-bearing interval from 66-69 meters (3 meters) grading 76 g/t Ag, 0.03% Pb, 0.09% Zn, 72 g/t AgEq. Lightly mineralized sulfide bearing sediments were encountered at a depth ~200m redefining the shape of previously interpreted andesite dome and significantly extending the area of exploration interest.

PND123 was drilled immediately outside of the resource limits to the north and encountered 27 meters of 159 g/t Ag, 0.28% Pb, 0.05% Zn, 154 g/t AgEq starting at 3.0 meters depth, including 1.5 meters of 565 g/t Ag, 0.30% Pb, 0.08% Zn, 518 g/t AgEq. A second 7.5 meter interval at 37.5-45.0 meters with 68 g/t Ag, 0.11% Pb, 0.07% Zn, 67 g/t AgEq was encountered.

PND124 was drilled 80 meters north of the resource and hit mineralization starting at surface encountering 28.5 meters of 22 g/t Ag, 0.42% Pb, 0.74% Zn, 63 g/t AgEq.

PND125 was drilled 25 meters east of the resource and also encountered mineralization starting at surface to 18.8 meters of 33 g/t Ag, 0.2% Pb, 0.52% Zn, 56 g/t AgEq including 5.0 meters of 80 g/t Ag, 0.40% Pb, 1.13% Zn, 130 g/t AgEq from 10.4-15.4 meters.

PND126 was collared just outside the resource drilling west into the resource and encountered mineralization from surface to 31.0 meters of 31 g/t Ag, 0.22% Pb, 0.09% Zn, 39 g/t AgEq, including 78 g/t Ag, 0.27% Pb, 0.08% Zn, 82 g/t AgEq.