Bralorne Gold Project Resource Conversion Program Intersections Reported
TORONTO - Talisker Resources Ltd. reported additional high-grade drill results highlighted by 38.17 g/t Au over 5.20 metres at its 100% owned flagship Bralorne Gold Project. Talisker initiated resource conversion drilling last October, with 15,000 metres of planned drilling and completed the program this February. Hole SB-2024-008A intersected 97.40 g/t Au over 2.00 metres within a broader intercept of 38.17 g/t Au over 5.20 metres on the Alhambra Vein. Hole SB-2024-011 intersected 9.58 g/t Au over 1.90 metres within a broader intercept of 4.22 g/t Au over 8.15 metres on the BK-9870 Vein. The resource conversion drill program focused on increasing confidence in the Alhambra, BK and BK-9870 Veins. A total of 81 drill holes were drilled during the resource conversion program, totaling 14,949 metres.
All 2023 assays have been received. Currently, there are 896 samples from the 2024 Q1 drilling program at the assay laboratory awaiting to be received.
Hole SB-2024-008A has received all assays. It is located in the King block and hosted in diorite intrusive. Intersected Alhambra Vein from 176.3-177.3m.
Hole SB-2024-011 also reported all assays received. Also located in the King block and hosted in diorite intrusive. At the hole is has been reported of the intersected BK-9870 Vein from 201.15-203.35m and 208.45-211.50m.
Major vein structures intersected are considered classic Bralorne crack-seal quartz-carbonate veins with densely banded sulphide septae. Crack-seal septae host fine-grained arsenopyrite and pyrite mineralization. Alteration halos consist of strong silica-sericite±mariposite alteration halos.