Results Of Carbon Shipment Carrying Gold And Silver Have Been Processed and Refined


PHOENIX, AZ - Tombstone Exploration Corporation reported on the processed and refined ore from Metalor that was shipped from the Bonanza Harquahala Mine. This is the third delivery of precious metals in 2022. The results of the processed material produced 303.85 oz of dore which delivered 65.96 oz of Au and 58.51 oz of Ag.

The leach has been running 24/7 and continues as crushed rock and leach material are loaded onto the pad. The fourth shipment for processing the carbon and refining the gold and silver ore for 2022 is expected to be shipped in June.

The Bonanza Mine property includes the Harquahala and Golden Eagle mines located approximately eight miles south of Salome, Arizona. The project totals 2,656 acres and has significant potential for gold and silver production in multiple phases moving forward.