VANCOUVER - Leocor Mining Inc. reported on the exploration and development of precious metals projects…
Kay Mine Project Initial MRE Has Been Completed
TORONTO – Arizona Metals Corp. reported that initial Mineral Resource Estimate (MRE) for its Kay Mine Project located in Yavapai County, Arizona has been completed. The underground MRE includes 9.28 million tonnes grading 1.39 g/t Au, 27.6 g/t Ag, 0.97% Cu, 0.33% Pb, and 2.39% Zn in the Indicated category, and 0.86 million tonnes grading 1.06 g/t Au, 15.4 g/t Ag, 0.87% Cu, 0.20% Pb, and 1.68% Zn in the Inferred category, at a base-case cut-off grade of 1.00 % CuEq.
Copper equivalent MRE grades are 9.28 million tonnes @ 3.18% CuEq in the Indicated category and 0.86 million tonnes @ 2.44% CuEq in the Inferred category. Quality Asset: High grade, with good geometry and continuity suitable for bulk underground mining methods. Camp Potential: The initial MRE sits within less than 5% of the 10-km long strike of folded prospective host rocks in the Kay Project. Infill Potential: This initial MRE has clear potential to expand between existing drill holes within the deposit, and to upgrade Inferred resource.
Related Posts
VANCOUVER - Banyan Gold Corp . announced the first Indicated Mineral Resources with the updated…
VANCOUVER - First Majestic Silver Corp. reported the total production in the second quarter of…