VANCOUVER - Rockland Resources Ltd. has received tentative approval for drilling at its Claybank Beryllium…
Reported On The Current Program At The Elemes Project
VANCOUVER – Arras Minerals Corp. reported on drillholes EL25012 and EL25013 from the 2025 drill program currently underway on the Elemes Project in Northeast Kazakhstan. The program aims to test widespread targets along the 8.8 kilometre Berezski Trend and the 14 kilometre Aimandai Trend.
Highlights include: EL25012: 578m of mineralization grading 0.41 % copper-equivalent (“CuEq”) (0.14% Cu and 0.21 g/t Au), starting at 3m depth; including: 440m grading 0.49% CuEq (0.16% Cu and 0.25 g/t Au) starting at 137m depth; 114m grading 0.53% CuEq (0.22% Cu and 0.20 g/t Au) starting at 147m depth; and 252m grading 0.52% CuEq (0.15% Cu, and 0.29 g/t Au) starting at 325m depth.
Tim Barry, CEO, said, “Arras has three drill rigs currently turning across our licence package in Northeast Kazakhstan. Two of the drill rigs are working on the Elemes Project and the third is following up targets identified on the Arras-Teck Exploration Alliance properties. The initial pass of the Phase 2 drill campaign currently underway on the Elemes Project aims to build on the success of our 2024 drill campaign and continue to target a wide variety of areas along the 8.8 kilometre Berezski Trend and the 14 kilometre Aimandai Trend. Hole EL25012 represents an excellent start to the Phase 2 program intersecting the thickest interval of gold-copper mineralization encountered to date at Berezski Central, highlighting the scale and depth potential of the system. We now plan to focus one rig at Berezski Central to commence a systematic drilling program with an aim to further enhance understanding of structural controls and build scale at this target.
Hole EL25013 is also very encouraging. While lower grade, it intersected nearly 300 meters of porphyry-style mineralization, 1.7 kilometres north of EL25012, demonstrating widespread thick pervasive mineralization along the Berezski Anomaly. Furthermore, Hole EL25013 is the first drill hole to test the 5 kilometre gap between Berezski Central target and Berezski North target – which drilling, announced in February of this year, intersected 547 meters of 0.70% CuEq starting from 14 metres.”
Add Your Heading Text Here
Add Your Heading Text Here
Related Posts
TORONTO - Americas Gold and Silver Corporation Chairman and CEO, Paul Andre Huet, said, “During…
VANCOUVER - GMV Minerals Inc. reported on the Preliminary Economic Assessment (PEA) study of the…