MONTREAL - Aya Gold & Silver Inc. reported on the exploration program at the Zgounder Silver…
Second Gold & Silver Pour At Borealis Minesite
TORONTO – Borealis Mining Company Limited has successfully completed its second pour of gold and silver doré from the previously announced stockpile crushing and heap leaching at the Borealis minesite. A total of 42.83 pounds, equivalent to 617 troy ounces of doré, was poured.
Borealis is awaiting assay results from the pour to determine the grade and value of the doré but preliminary results indicate roughly a 50-50 gold-silver ratio, plus some additional waste metal. Heap leaching and crushing of the stockpile of oxide material continues, with approximately 153,000 tons crushed to date. Gold and silver are actively being collected in Borealis’ carbon columns and the Company anticipates additional pours before year-end. In conjunction with this pour, the Company completed its annual stack testing, a regulatory requirement that ensures the plant is operating within environmental standards.
Related Posts
DENVER, CO - Rod Antal, Executive Chairman of SSR Mining, said, “The fourth quarter of…
VANCOUVER - VR Resources Limited reported that the 3D-array DCIP geophysical survey is now underway…