Skip to content
The-Mining-Record_Logo_136_1_3x

Broad Intercepts And Visible Gold At Estelle Project

ANCHORAGE, AK – Nova Minerals Limited reported on the RPM Valley deposit with the 2025 closely spaced infill results returning multiple broad intercepts >1 g/t Au, and visible gold observed in an Estelle Project record intercept of 0.5 m @ 364 g/t Au, within the Estelle Gold and Critical Minerals Project, located in Tintina Gold Belt in Alaska.
Drill results include the highest-grade intercept drilled at RPM – and over the greater Estelle Project – to date of 0.5m @ 364 g/t Au from 101m, with visible gold observed in the drill core.
Broad gold intersections continue at RPM Valley with the 2025 closely spaced infill results expected to support a maiden Measured and Indicated Mineral Resource at the valley deposit, in support of the Pre-Feasibility Study (PFS). Mineralization remains wide open with numerous holes extending below the current pit shells.
10 RC holes were completed in the RPM glacial till using Nova’s in-house rig as a preliminary, cost-effective test, returning a notable intercept of 33 m @ 0.3 g/t Au from surface (RPMRC-009). Results indicate the essentially drilled and blasted till material may be at least 30m thick over ~330,000 m², and this area remains a high-priority target, with future work to focus on improved sampling methods and thickness verification.

Back To Top