VANCOUVER - Sky Gold Corp. reported on geophysical and integrated geological surveys completed at its…
Scottie Drill Program Successful With High Grade Vein Systems
VANCOUVER – Scottie Resources Corp. reported on the 2025 drilling of the Road and Blueberry Contact Zone within the Scottie Gold Mine Project. The road-accessible Scottie Gold Mine Project, which includes the past-producing Scottie Gold Mine and the adjacent Blueberry Contact Zone, is located 35 kilometres north of Stewart, BC, and is the subject of a newly released Preliminary Economic Assessment (PEA) entitled Scottie Gold Mine Project.
In addition to a high-grade intercept in the Fifi Zone, drilling results also confirm the discovery of a new near surface vein in the Bend. Notably, at the Road Zone, drilling encountered a high-grade intercept outside of the current resource model but within the PEA’s open pit shell.
“These results clearly demonstrate the success of Scottie’s 2025 drill program, delivering increased geological confidence on our high-grade vein systems such as Fifi, confirming resource expansion potential within the existing open pit shell, and highlighting the discovery of new veins at the Bend area,” stated Dr. Thomas Mumford, President. “This drilling underscores the strength of our systematic exploration approach, delivering results across multiple fronts and reinforcing the significant upside across the project. We look forward to returning to the drill this season as we continue to advance and expand the system.”
Related Posts
VANCOUVER - Freegold Ventures Limited reported successful identification of a new mineralized area at its…
VANCOUVER - Tectonic Metals Inc. reported on drill holes completed during the 2025 drill campaign…