June 19, 2025Bayhorse Silver Stockpiles Stope Mineralization Bayhorse Silver Stockpiles Stope Mineralization VANCOUVER, BC – Bayhorse Silver Inc. (BHS) has accessed the first stope at the Bayhorse Silver Mine, East Central Oregon. American Mining and Tunneling, its underground safety operations contractor, has already stockpiled approximately…
June 19, 2025Lucky Friday Operations Return To Normal With Upgraded Ventilation System Lucky Friday Operations Return To Normal With Upgraded Ventilation System COEUR D’ALENE, ID – Hecla Mining Company reported that Lucky Friday’s third quarter silver production of 592,243. A failure of the underground booster reduced the ventilation capacity of…
June 19, 2025Sleeper Gold Project PEA AssessmentSleeper Gold Project PEA Assessment WINNEMUCCA – Paramount Gold Nevada Corp. reported that a new Preliminary Economic Assessment (PEA) on its 100% owned Sleeper Gold Project in Nevada has been completed by Metal Mining Consultants (MMC) of Denver, Colorado…
June 19, 2025New Drill Data At The Grass Valley ProjectNew Drill Data At The Grass Valley Project VANCOUVER, BC – Nevada Exploration Inc. (NGE) has received new analytical results from eight drill holes at its 100% owned Grass Valley Project. This new drill hole information confirms the presence…
June 19, 2025Positive Feasibility Study For Gold Bar ProjectPositive Feasibility Study For Gold Bar Project TORONTO – McEwen Mining Inc. reported results of a Feasibility Study (FS) for its 100% owned Gold Bar Project in Nevada. The key outcomes of the study include: Low initial capital of…
June 19, 2025Three New Gold-Bearing Zones At Casault/New Drilling Campaign BeginsThree New Gold-Bearing Zones At Casault/New Drilling Campaign Begins MONTREAL – Midland Exploration Inc. and SOQUEM INC. report the intersection of three new gold-bearing zones on the Casault project, confirming the potential west of the mineralization intersected in 2012…
June 19, 2025Update On Eastside Gold Project Drill Program Update On Eastside Gold Project Drill Program VANCOUVER, BC – Columbus Gold Corporation reported an update on the current drill program at its 100% owned Eastside gold project in Nevada. The current drill program consists of 250 rotary…
June 19, 2025Kennecott Launches Project To Rehabilitate Mountainside Kennecott Launches Project To Rehabilitate Mountainside SALT LAKE CITY, UT – The view of the southwestern Salt Lake Valley will be undergoing a major facelift over the next few years a $100 million facelift. Rio Tinto Kennecott has…
June 19, 2025Significant Progress At Mount Milligan Mine Significant Progress At Mount Milligan Mine DENVER, CO – During the second quarter, we made significant progress at Mount Milligan Mine compared to the first quarter of this year, including improved throughput, recoveries and unit cash costs," said…
June 19, 2025Copper Mountain Mine Reports Production Results Copper Mountain Mine Reports Production Results VANCOUVER – Copper Mountain Mining Corporation reported production results for the second quarter of 2015 from the Copper Mountain mine located in southern British Columbia. In the second quarter of 2015, the…