June 19, 2025Initial Pilot Plant Results Of 99.88% Purity From Recovered NMC Cathode MaterialInitial Pilot Plant Results Of 99.88% Purity From Recovered NMC Cathode Material SURREY, BC – American Manganese Inc. reported that 99.88% purity was achieved in its production of NMC cathode material using the RecycLiCoTM process. This high purity recycled…
June 19, 2025Permitting Update On The La India ProjectPermitting Update On The La India Project LONDON, UK – Condor Gold reported an update on the progress the Company is making with the permitting process at La India Project, Nicaragua. The Company is in full compliance with the…
June 19, 2025Additional Capacity For Growth With Final Phase Expansion Of Maria Dama PlantAdditional Capacity For Growth With Final Phase Expansion Of Maria Dama Plant TORONTO, ON – Gran Colombia Gold Corp. reported that it produced a total of 18,882 ounces of gold in June bringing the total for the second quarter…
June 19, 2025Drill Rig Moved To Test Arete Prospect Targets At Red Mountain ProjectDrill Rig Moved To Test Arete Prospect Targets At Red Mountain Project AUSTRALIA – White Rock Minerals Ltd reported an update on the 2019 exploration program underway at the Red Mountain high-grade zinc and precious metals VMS project in…
June 19, 2025Mineral Valle Central Produced 13.3 Million Pounds Of Copper In Q2Mineral Valle Central Produced 13.3 Million Pounds Of Copper In Q2 VANCOUVER, BC – Amerigo Resources Ltd. reported production results for Q2-2019 from Minera Valle Central ("MVC"), the Company’s 100% owned operation located near Rancagua, Chile. Production remained affected…
June 19, 2025Diamond Drilling Program At the Chance Target AreaDiamond Drilling Program At the Chance Target Area VANCOUVER, BC – Dolly Varden Silver Corporation reported results of the first batch of 4 drill holes from the 2019 diamond drilling program. These holes are in the Chance Target Area,…
June 19, 2025Drilling Expands High-Grade Camp Zone At The Condor ProjectDrilling Expands High-Grade Camp Zone At The Condor Project VANCOUVER, BC – Luminex Resources Corp. reported results from the final two holes of its initial four hole, “Phase 1” diamond drilling program at the Camp Zone in the northern…
June 19, 2025Results From Rock Sampling Program/Final Stages Of Permitting Diamond Drilling At Olivine MountainResults From Rock Sampling Program/Final Stages Of Permitting Diamond Drilling At Olivine Mountain VANCOUVER, BC – GSP Resource Corp. reported that it is in the final stages of the permitting process for the proposed drilling program on the Company’s…
June 19, 2025Second New Discovery At The Black Pine ProjectSecond New Discovery At The Black Pine Project VANCOUVER, BC – Liberty Gold Corp. reported hat new drilling at Black Pine in southern Idaho has successfully intersected another thick zone of high grade oxide gold mineralization, expanding the size…
June 19, 2025Gold Bar Production Ramp Up To Full Production Is Progressing Gold Bar Production Ramp Up To Full Production Is Progressing TORONTO – McEwen Mining Inc. reported consolidated production for Q2 2019 of 36,216 gold ounces and 850,525 silver ounces, or 45,881 gold equivalent ounces. The San José and…