VANCOUVER – American Pacific Mining Corp. reported on the final six (6) of eight (8) reverse circulation (RC) drill holes completed during Phase I 2025 drilling at the Madison Project. APMAD25-08 intersected three different mineralized zones, with the upper zone returning 44.1 g/t Au over 1.5 m within a broader interval averaging 10.2 g/t Au over 7.6 m, starting from 189.2 m downhole. The second zone returned 4.5 g/t Au and 0.2%Cu over 3.0 m, starting from 230.1 m downhole. APMAD25-08 was a 175 m step-out to the northwest of the historical Broadway Mine area, with very limited drilling in between, highlighting the expanded exploration search space and emerging link between the Broadway and Madison mines. APMMAD25-05 extended the copper mineralized envelope down plunge towards the common vector between the Broadway and Madison mines, with 0.5% Cu over 27.4 m and 0.7 g/t Au over 16.8 m. APMMAD25-06 returned significant pathfinder mineralization, including a notable interval of 3.0 m averaging 0.23% Bi with 14.5 ppm Te and 4.5 m of 159 ppm Bi with 63 ppm Te. APMMAD25-07 and 08 returned further porphyry-style geochemical signatures, including assay values of up to 25.8 ppm Bi with 11.9 ppm Te over 1.5 m.