Skip to content
The-Mining-Record_Logo_136_1_3x

IMA Mine Successful Completion Of Rehabilitation Work

VANCOUVER – American Tungsten Corp. reported on the successful completion of rehabilitation work on the D level adit at its flagship project, the IMA Mine, alongside the commencement of underground development in preparation for diamond drilling. In parallel with underground rehabilitation and drill station preparation at the IMA Mine, American Tungsten has initiated preliminary discussions and technical evaluations to assess the potential transition from a Direct Shipping Ore (DSO) model to full-scale onsite milling.

The Company has received a metallurgical testwork proposal and summary report outlining a conceptual processing system to support the establishment of a mill onsite. This marks the beginning of a structured process design initiative aimed at unlocking long-term geological and economic value from the Company’s high-grade tungsten asset.

American Tungsten has initiated a metallurgical testwork and process design program to support design of a mill onsite to process mineralized materials from the IMA Mine. 

Back To Top