EDMONTON - Sranan Gold Corp. reported on the Randy's Pit target at its Tapanahony Project,…
Positive Phase II Metallurgical Testwork At Oxide Gold-Antimony Limo Butte Project
VANCOUVER — NevGold Corp. reported on further positive antimony metallurgical testwork results at its oxide gold-antimony Limousine Butte Project in Nevada. The positive antimony metallurgical recovery results on a range of antimony grades from 0.1% Sb to 8.5% Sb highlight the strong geo-metallurgical characteristics of the Project. The antimony recovery results also have minimal to no impact on gold recoveries, and are a key development in unlocking the substantial gold-antimony potential of Limo Butte.
CEO, Brandon Bonifacio, said, “The results from Phase II antimony metallurgical testwork has proven that leaching on a wide range of antimony grades from 0.1% Sb to 8.5% Sb works favorably at Limo Butte. The results from the 0.1%-0.2% antimony grade range had recovery of 71% to 85% exceeding our expectations and demonstrating the strong geo-metallurgical characteristics for both antimony and gold at the Project. With the additional Phase II metallurgical testwork completed, we have a large dataset with a wide range of antimony grades, which significantly de-risks the metallurgy and further unlocks the gold-antimony potential at Limo Butte. We eagerly await our further drill results, specifically the follow-up drilling around the new high-grade antimony discovery made at the Bullet Zone released on October 16, 2025.”
Related Posts
VANCOUVER - Koryx Copper Inc. reported on progress at its two large scale exploration licences…
VANCOUVER - Myriad Uranium Corp. has just completed a large-scale helicopter-borne radiometric and magnetic survey…