Skip to content
The-Mining-Record_Logo_136_1_3x

Zavitz Discovery Zone Drilling Resumes At Moray Gold Project

TORONTO – New Break Resources Ltd. reported a second phase of drilling is underway at the Moray gold project to further test the newly discovered Zavitz gold zone and to test key structural targets.
Further diamond drilling to follow up on the results from the recent 1,502 metre maiden drilling program that intersected 4.11 grams per tonne gold (g/t Au) over 31.3 metres in drillhole NBR-25-05 and 3.35 g/t Au over 14.8 metres in drillhole NBR-25-04. The second phase of drilling began on October 23, 2025, and is expected to run for approximately four to six weeks, where a minimum 1,500 metres is initially planned. Moray is located 49 km southeast of Timmins, Ontario.
William Love, Chief Executive Officer, said, “New Break has resumed drilling at Moray following the exciting discovery made in the Zavitz gold zone during our maiden drilling program. This phase of drilling is focused on further testing the sulphide-bearing volcanic rocks and the syenite contact in the Zavitz zone. A recent downhole geophysical survey has identified a near surface 450 metre long zone of conductive sulphides, outlined from drillhole NBR-25-04. Phase 2 drilling is designed to advance our understanding of the gold mineralization in the volcanics and surrounding structures, with a view to expanding our gold discovery in the Zavitz zone.”

Back To Top