VANCOUVER - Sky Gold Corp. reported that drilling has commenced at the Evening Star property,…
Mobilization Of Drill Rig & Crew At The Santa Fe Project
TORONTO – Lahontan Gold Corp. has mobilized a track-mounted reverse-circulation (RVC) drill rig and crew to the Santa Fe Mine project in the Walker Lane, Nevada. The MPD-1500 RVC track-mounted drill rig will focus on in-fill drilling, upgrading gold and silver resources from the Inferred to Indicated category, and expanding overall resource numbers at the Slab and York areas of the Santa Fe Mine. The drilling program will consist of up to 25 drill holes totalling 4,000 metres, targeting shallow oxide gold and silver mineralization.
Kimberly Ann, Executive Chair, Founder, CEO, and President, said, “Lahontan is excited to begin its Fall 2025 drilling program at the Santa Fe Mine. Utilizing the results from our Phase One 2025 drill program, the geologic team has carefully targeted multiple areas at the Slab and York deposits where gold and silver resources can be upgraded and expanded. The drill program is vital as the Company pivots from resource definition to mine planning and permitting in 2026. Combined with ongoing metallurgical testing, this drilling program sets the stage for detailed mine scheduling, planning, and the mine permitting process.”
Related Posts
VANCOUVER - Getchell Gold Corp. reported on drill holes FCG25-33 through to FCG25-35, testing a…
TORONTO - KO Gold Inc. reported on the Otago Gold Belt region, South Island, New…