Skip to content
The-Mining-Record_Logo_136_1_3x

Copper Intersection At The Aurora Project

CRANBOOK – DLP Resources Inc. reported on drillholes A25-025 on the Aurora porphyry copper-molybdenum-silver project in southern Peru.
Drillhole A25-025 was drilled off platform A25-024 with the aim of extending and infilling mineralization to the southeast. This drillhole intersected a partially leached zone from 2.00m to 92.00m and copper-silver and molybdenum mineralization from 92.00m to the end of the hole at 901.60m. Summary results were as follows: 1) 0.12% CuEq over 90.00m from 2.00m to 92.00m. 2) 0.47% CuEq over 809.60m from 92.00m to 901.60m. 3) 0.35% CuEq over 238.00m from 224.00m to 462.00m. 4) 0.58% CuEq over 439.60m from 462.00m to 901.60m.
Ian Gendall, President and CEO, said, “Drillhole A25-025 was successful in extending and infilling copper, molybdenum and silver mineralization to the southeast. As expected, the mineralized intercepts continued and it is noted that once again the hole bottomed in mineralization. An additional two drillholes, A25-026 and 027 are in progress and will be completed soon. We are on track to update the initial Mineral Resource Estimate and complete the Preliminary Economic Assessment (PEA) by Q1 of 2026.”

Back To Top