Skip to content
The-Mining-Record_Logo_136_1_3x

Ongoing Drilling At The Mercur Gold Project

TORONTO – Revival Gold Inc. reported on the ongoing drilling at the Mercur Gold Project in Utah. Received assay results from eleven drill holes with the following highlight intersections: 1) 1.4 g/T gold over 44.2 meters width in RM25-117. 2) 1.0 g/T gold over 24.4 meters width in RM25-120. 3) 1.7 g/T gold over 12.9 meters width in RMC25-017. 4) 0.9 g/T gold over 24.4 meters width in RM25-113.
RMC25-120 intercept shows resource expansion potential down-dip from the 2025 Mercur Preliminary Economic Assessment (PEA) pit shell. Continued confirmation of gold occurrence, grade and leachability with PEA estimates. Average intercept depth starts at 45 meters downhole, highlighting the shallow nature of the Mercur gold deposit.
Revival Gold has completed 100 holes and about 10,000 meters of the planned 13,000-meter drilling program. Drilling continues with three rigs at Mercur and one at Beartrack-Arnett in Idaho. Additional results are pending.
“This year’s drilling at Mercur continues to align with the project’s PEA results and we are seeing strong indications of exploration upside beyond the current mine plan”, said Hugh Agro, President & CEO. “Mercur is a shallow oxide deposit, with a strike of about 4 kilometers in the Main Mercur area alone. Shallow depths and broad deposit extent translate into lower extraction costs and meaningful mine plan expansion potential.”

Back To Top