Skip to content
The-Mining-Record_Logo_136_1_3x

Phase Two Program At The Manhattan District

VANCOUVER – Scorpio Gold Corp. reported on seven holes from its 2025 drilling program at the Manhattan District Project, Nevada, Phase Two program (25MN-027 through 25MN-033).
Zayn Kalyan, CEO and Director, said, “Scorpio Gold continues to drill holes that step out from the existing resource model, both laterally and at depth, and that continue to expand the resource envelope and the constraining pit, modelled at a gold price of US$2,500. Importantly, the results reported to date demonstrate that this drilling is additive to the existing mineralized system, with multiple intercepts extending mineralization beyond the current inferred resource footprint and contributing to the potential for increased mineralized tonnage. Additionally, this new drilling has intercepted both previously mapped and newly recognized mineralized structures, building on the team’s understanding of the deposit’s structural framework and enhancing our ability to predict future accretive drill targets. Results from the 12 completed holes are eagerly anticipated and will be released in the New Year. We recognize that, with three drills now in the field, there is an expectation for a cadence of results to be delivered to the market, and we will endeavour to maintain a consistent flow of results, subject to laboratory turnaround times and rigorous QA/QC.”

Back To Top