VANCOUVER - Nevada Sunrise Metals Corporation reported its exploration plans for the fall of 2025…
Mercury Gold Project Drilling Program Ongoing
TORONTO – Revival Gold Inc. reported initial results from the drilling program at Mercur Gold Project located in Utah. Revival Gold has completed 53 holes, and 5,300 meters of this year’s planned 13,000-meter drilling program. Assay results have been received for the first nine RC drill holes (RM25-088, 090, 091, 092, 094, 095, 096, 100, and 101) located in the Marion Hill and Rover areas and the first core drill hole (RMC25-014) located in the Mercur Hill area and include: 1) RM25-094 intersected 0.85 g/t gold over 21.3 meters drilled width. 2) RM25-096 intersected 0.73 g/t gold over 22.9 meters drilled width. 2) RM25-100 intersected 1.04 g/t gold over 19.8 meters drilled width. 3) RM25-101 intersected 0.63 g/t gold over 22.9 meters drilled width. 4) RMC14-014 intersected 1.52 g/t gold over 7.6 meters drilled width.
Drilling is ongoing with two RC rigs and one core rig at Main Mercur focused on mineral resource conversion and metallurgical testing. In general, mineralization and leachability results collected to date in the 2025 program are consistent with the Inferred Mineral Resource and metallurgical models developed for the Mercur Preliminary Economic Assessment.
“Revival Gold is off to a favourable start with excellent grades in shallow drilling from the first ten holes at Mercur this year,” said Hugh Agro, President & CEO. “We are now 40% through the drilling program and initial assay results from drill holes sampled to date are consistent with the levels of mineralization and leachability we’d hoped to see. Additional assay results will be released as they become available in the weeks and months ahead.”
Related Posts
TORONTO - Western Uranium & Vanadium Corp. reported the successful closing of the acquisition of…
VANCOUVER - Headwater Gold Inc. reported that drilling has commenced on the Lodestar project, located…