VANCOUVER - Nevada Sunrise Metals Corporation reported its exploration plans for the fall of 2025…
Berezski East Target Drilling Continues
VANCOUVER – Arras Minerals Corp. reported on the Berezski East Target at the Elemes Project. Hole EL25019 delivered wide zones of high-grade gold-copper mineralization starting at surface. This hole underscores the scale potential that is developing in the Berezski Central – Berezski East area of the Elemes Project. EL25019: 457.50m of mineralization grading 0.63 g/t gold-equivalent (AuEq) (0.61 g/t Au and 0.10% Cu), starting at surface; including 231.0m grading 0.98 g/t AuEq (0.97 g/t Au, 0.13% Cu) starting from surface; and 91m grading 1.77 g/t AuEq (1.79 g/t Au, 0.19% Cu) starting at 88m depth. EL25017: 37.0m of mineralization grading 0.13 g/t gold-equivalent (AuEq) (0.11 g/t Au and 0.02% Cu). 9.5m of mineralization grading 0.55 g/t AuEq (0.48 g/t Au, 0.08% Cu)
Tim Barry, CEO, said, “Drillhole EL25019 has delivered an exceptional high-grade gold-copper intercept from surface, confirming Berezski East’s strong potential to host broad zones of high-grade mineralization. Broad zones of potassic alteration and the presence of copper minerals such as bornite and chalcopyrite suggests this target may form part of a larger porphyry system — a highly encouraging development. When we look at the area between Berezski Central and Berezski East, we continue to see the potential for continuity and scale. Additional holes are being planned at Berezski East, and we already have a focus at Berezski Central with one dedicated drill rig currently operating there.”
Related Posts
TORONTO - Western Uranium & Vanadium Corp. reported the successful closing of the acquisition of…
VANCOUVER - Headwater Gold Inc. reported that drilling has commenced on the Lodestar project, located…