Skip to content
The-Mining-Record_Logo_136_1_3x

Pine Ridge Uranium Project Drill Program Confirms Uranium Mineralization

WINNIPEG – Snow Lake Resources Ltd., d/b/a Snow Lake Energy, has received the final set of drill results from an additional 21 drill holes (out of a total of 114 holes) that have been completed on the Pine Ridge Uranium Project, located in the prolific Powder River Basin in Wyoming, a 50/50 joint venture (the “Joint Venture”) with Global Uranium and Enrichment Limited (GUE).
This successful drill program confirmed the presence of widespread uranium mineralization at Pine Ridge, while testing only a very small percentage of the large land package, and established the continuity of mineralization in multiple areas and identified at least 25 mineralized roll fronts contained within three major sandstone packages.
“We are extremely pleased with the results of our 2025 drill program,” said Frank Wheatley, CEO. “Pine Ridge is a very large land package in the heart of U.S. domestic uranium production and has demonstrated widespread and continuous uranium mineralization across multiple sand packages. Having only test a small portion of Pine Ridge, we will now analyze the results of our 2025 drill program with a view to planning the next significant drill program.”

Back To Top