Comstock Mining Amends Tonogold For Accelerated Gold And Silver Exploration Drilling VIRGINIA CITY, NV…
Initial Mineral Resource Estimate Commissioned At Kibi Gold Project
Initial Mineral Resource Estimate Commissioned At Kibi Gold Project
TORONTO, ON – Xtra-Gold Resources Corp. has commissioned SEMS Exploration Services Ltd. of Accra, Ghana to prepare an initial NI 43-101 – compliant mineral resource estimate on the Big Bend and East Dyke gold zones located within Zone 2 of the Company’s wholly-owned Kibi Gold Project, located in the Kibi — Winneba greenstone belt, in Ghana, West Africa. SEMS is a leading full-service mineral exploration and mining consultancy company in West Africa; with offices in Ghana, Burkina Faso, Cote d’Ivoire, and Mauritania. This will constitute the first ever mineral resource estimate generated on a gold project within the underexplored Kibi Greenstone Belt.
The Company is also pleased to report that its 2012 diamond drilling campaign is well underway with a total of 31 holes completed to date for a total of 6,654 m of core. The present drilling is designed to further delineate/infill the Big Bend Zone — Central Granitoid and the South Ridge Granitoid Zone; as well as further test/delineate other prominent gold systems and geophysical/geochemical anomalies along the approximately 5.5 km NE–trending Kibi Gold Trend. The 31 holes (#KBDD12186 to #KBDD12216) drilled in this year’s campaign to date include: 3 holes (1,092 m) on the Big Bend Zone and 3 holes (381 m) on the South Ridge Granitoid Zone in Zone 2; 10 holes (2,293 m) on the Double 19 Zone in Zone 3 – East; 4 holes (491 m) on the Kibi Old Mine prospect; 3 holes (782 m) on Zone 1; 4 holes (995 m) on the Zone 4 Gold Trend; and 4 holes (620 m) testing grassroots geophysical targets with coincidental gold-in-soil anomalies.
Comments (0)